I. Evolution of rain:
Rainfall from 7pm on October 5 to 16h on October 17 in the province is ranging from 1,500 mm to 2,200 mm, in some places higher, such as: Huong Son 2,498 mm, Hai Tan 2,453 mm, Ta Rut 2,447 mm, Dakrong 2,340 mm, My Chanh 2,279 mm, Huong Hiep 2,169 mm, Vinh O 2,205 mm, ...
- On October 16-17, 2020 (from 7:00 a.m. on October 15 to 16:00 a.m. on October 17), the province has very heavy rain, especially heavy places, the measured rainfall reaches from 370- 400 mm, there are higher places like Huong Son station 875 mm, Huong Hiep 738 mm, Khe Sanh 710 mm, Vinh O 673 mm, Dau Mau 671 mm, Dong Ha 558 mm, Dakrong 555 mm,…, as follows:
+ Very heavy rain in 03 hours: From 07:00 to 10:00 on October 16 at Dong Ha Meteorological Station, it is 133 mm; from 10:00 to 13:00 on October 16 at the stations: Dau Mau 160 mm, Hai Tan 147 mm, Huong Hiep 143 mm, Vinh O 123 mm, Meteorological Dong Ha 108 mm; from 04:00 to 07:00 on October 17 at stations: Khe Sanh 188 mm, Dakrong 130 mm, ...
+ Particularly heavy rains during 06 hours have occurred in districts of Cam Lo, Dakrong, Huong Hoa and Dong Ha city, specifically: At Dau Mau station (located in Cam Thanh commune, Cam Lo district), there is 06 hours of rain ( from 10:00 to 16:00 on October 16) is 249 mm, at Dong Ha Meteorological Station (located in Cam Thanh An commune, Cam Lo district) with 6 hours of rainfall (from 07h-13h on October 16) is 241 mm, at Huong Son station (Huong Hoa district) with 06 hours rainfall (from 22:00 on October 16 to 04:00 on October 17) is 225 mm, rainfall at 06 hours (from 01:00 to 07:00 on October 17) at Khe Sanh station (Huong Hoa ) is 287 mm and at DaKrong station is 243 mm.
II. Water levels of rivers:
Currently (time: 4am on October 18), floods on rivers are rising, spread from approximately alert 3 to above alert 3, only Thach Han River in Quang Tri town reaches 7.40 m exceeding alarm 3 by 1.40 m; Hieu river (in Dong Ha city) reached 5.35 m, exceeding alert 3 by 1.35 m, exceeding the historic flood peak of 1983 by 0.77 m (exceeding the flood peak on October 8th).
III. Situation of reservoirs, hydroelectricity
Currently, the capacity of large and medium irrigation reservoirs is around 75-100%. Small reservoirs are basically filled with water.
As for the reservoir for Quang Tri Hydropower and Irrigation, the storage capacity has been reached, the water discharge has been regulated through the spillway from 14:00 on 11/10/2020; Currently (at 7:00 am on October 18, 2020) the discharge over the spillway is 732 m3/s and it is adjusted based on changes in flow to the lake.
IV. Regarding flood, relocation and evacuation
From October 16-17, the province continued to have widespread deep flooding in all districts, towns and cities (except Con Co island district), in this new flood. 80/124 communes, wards and towns with 41,878 households/148,022 people were flooded, of which 8,212 households/24,524 people were evacuated to safe places, specifically:
|
No.
|
Unit
|
Flooding
|
Relocation
|
Note
|
|
No. households
|
No. people
|
No. households
|
No. people
|
|
1
|
Hướng Hóa District
|
1,291
|
5,868
|
1,104
|
5,024
|
Relocation and concentration
|
|
2
|
Đakrông District
|
542
|
2,246
|
973
|
3,962
|
Relocation and concentration
|
|
3
|
Cam Lộ District
|
4.503
|
14,777
|
1,046
|
3,040
|
Relocation and concentration
|
|
4
|
Đông Hà City
|
2.430
|
11,254
|
737
|
2,457
|
Relocation and concentration
|
|
5
|
Vĩnh Linh District
|
1.050
|
3,150
|
24
|
45
|
Relocation
|
|
6
|
Gio Linh District
|
493
|
1,326
|
61
|
178
|
Relocation and concentration
|
|
7
|
Quảng Trị Town
|
2.416
|
9,664
|
158
|
396
|
Relocation and concentration
|
|
8
|
Triệu Phong District
|
12,278
|
49,112
|
779
|
1,394
|
Relocation and concentration
|
|
9
|
Hải Lăng District
|
16,875
|
50,625
|
3,330
|
8,028
|
Relocation and concentration
|
|
|
Total
|
41,878
|
148,022
|
8,212
|
24,524
|
|
V. Damage situation
According to the quick report of localities and units, the immediate damage situation in the province is as follows:
- About people:
1.1. Dead: 18 people
Of which:
- Death caused by floods on land: 14 people.
- Dead by ship in distress at sea: 03 people (of which: 01 death due to poor health after 02 days being rescued ashore)
1.2. Missing people: 23 people
Of which:
- 01 person is missing at sea due to a ship's problem.
- 22 people were missing due to landslide: At 01h05 on October 18th in the area of Can village, Huong Phung commune, Huong Hoa district, Huong Hoa district, a landslide occurred in the cafeteria and workers’ guesthouse of the National Defense Economic Union 337. Currently, the provincial authorities are implementing plans and searching.
1.3. Injured: 12 people
Injured in the process of coping and overcoming consequences of rain and flood
The Provincial People's Committee, the Provincial Steering Committee for Information and Rescue Control promptly visited, encouraged and supported families with dead or injured people; Focus on directing the functional forces and local authorities to organize the search for the missing.
- Regarding housing: The total number of houses damaged was 147 houses, of which:
Completely damaged house (> 70%): 05 houses
+ House collapsed: 02 houses (Dakrong 01 house, Huong Hoa 01 house);
+ House was drifted: 02 houses (Huong Hoa);
+ The eroded house was completely buried: 01 house (the household of Mr. Ho Van Can, Cu Dong village, Huc commune, Huong Hoa district has moved to a safe place).
- Houses damaged from 30-50%: 142 houses, of which:
+ Huong Hoa: 68 houses were eroded, eroded, roof blown off;
+ Dakrong: 02 houses were eroded and eroded
+ Hai Lang: 17 houses have their roof blown off;
+ Dong Ha: 01 house with roof blown off; 01 house landslide;
+ Gio Linh: 19 houses have their roof blown off;
+ Trieu Phong: 30 houses were exposed to roof erosion, erosion, and
+ Quang Tri town: 02 houses have their roof blown off;
+ Vinh Linh: 03 houses have their roof blown off.
- Regarding education:
Many schools were flooded with rising water levels (with over 70 points), some places over 1 meter; damaged and damaged facilities in many schools: teaching equipment, school supplies, desks, office chairs, preschool kitchen system, collapsed fence walls, some school sites in mountainous districts (Huong Hoa and Dakrong are eroded) ...
- Regarding agricultural and forestry production:
- Area of rice flooded and backfilled: 316.5 ha (Huong Hoa 300.4 ha, Quang Tri town 05 ha, Gio Linh 06 ha, Vinh Linh: 5.1 ha);
- Area of agricultural land buried: 5.8 ha (Vinh Linh 3.6 ha, Gio Linh 2.2 ha).
- About livestock:
+ Cattle of all kinds died and swept away: 2,886 (Trieu Phong 1,394, Dong Ha 04, Cam Lo 150, Huong Hoa 85, Dakrong 11, Quang Tri town 560, Gio Linh 43, Hai Lang 639);
+ Poultry of all kinds died and swept away: 471,500 (Trieu Phong 264,344, Dong Ha 1,800, Cam Lo 66,000, Huong Hoa 1,757, Vinh Linh 3,725, Quang Tri town 11,122, Gio Linh 25,012, Hai Lang 97,740).
+ Floating duck eggs: 60,000 (Trieu Phong).
- Area of crops of all kinds: 2,578.92 ha (Dong Ha 155.0 ha, Trieu Phong 612 ha, Vinh Linh 71.7 ha, Cam Lo 500 ha; Huong Hoa 486.08 ha, Gio Linh 114.2 ha 630 ha, Hai Lang, Quang Tri 9.94 ha);
- Area of annual crops damaged (beans, maize, potatoes, cassava): 461.65 ha (Vinh Linh 135.35 ha, Trieu Phong 269 ha, Quang Tri town 50.8 ha, Dakrong 6.5 ha );
- The damaged fruit trees area: 296.89 ha (Huong Hoa 279.69 ha, Trieu Phong 15.7 ha, Gio Linh 0.5 ha, Dakrong 01 ha);
- Broken forest tree area:
+ Scattered planted forest area damaged: 15 ha (Vinh Linh);
+ Acreage of cajuput: 18 ha (Trieu Phong 09 ha, Gio Linh 15 ha, Quang Tri 04 ha);
+ Area of rubber and pepper: 26 ha (Gio Linh 04 ha, Huong Hoa 22 ha);
- Pot flowers were broken: 1,000 pots (Dong Ha);
- Damaged mushroom farm: 02 farms (Trieu Phong);
- Greenhouse for growing organic vegetables flooded: 300m2 (Huong Hoa);
- The seeds are wet and damaged: 455.2 tons of paddy (Hai Lang 450 tons, Gio Linh 5.2 tons);
- Food gets wet, washed away:
+ Rice: 46,595.9 tons (Dong Ha 34 tons; Cam Lo 700 tons, Trieu Phong 743.4 tons, Quang Tri town 98.2 tons; Gio Linh 185.3 tons, Hai Lang 44,835 tons);
+ Inundated rice: 40.6 tons (Trieu Phong);
+ Potatoes, cassava, and maize flooded: 14.8 tons (Trieu Phong).
- Damaged and damaged food for cattle and poultry: 99.7 tons (Trieu Phong 83.4 tons, Quang Tri town 06 tons, Gio Linh 10.3 tons);
- Fertilizer gets wet, damaged: 35 tons (Dong Ha 25 tons, Trieu Phong 10 tons);
- Animal breeding facilities were flooded: 456 units (Vinh Linh); 140 m2 (Gio Linh);
- Rice milling machine was flooded and damaged: 03 machines (Trieu Phong);
- Machinery and 01 truck of the food mill and purchasing factory were heavily damaged (Trieu Phong);
- Cooperative pumping station damaged: 02 (Trieu Phong);
- Mushroom growers were flooded, damaged all mushroom embryos: 01 piece (100m2) in Hien Thanh commune (Vinh Linh).
- About irrigation:
5.1. Vinh Linh District:
- Drifting Khe Can earth dam of Lien Cong Dong cooperative of Hien Thanh commune, drift length 15m;
- Ta Ben Hai dyke was landslide for the section passing Vinh Giang commune, eroded length 100m;
- Vinh O commune: Embankment landslide along stream 30m; water washed away 1,100m of water pipeline from the dam to the village; 2 hamlet earth dam is broken 20m (Tarec slot dam).
- Vinh Giang commune: The irrigation ditches and ditches were eroded, the entire coast of the region was 2,300m; Mon Ha canal was buried 170m; Fencing drain broken rotational drive
5.2. Gio Linh district:
- Embankment is landslide: 1,842 m; Concrete irrigation canal collapsed, damaged: 2,260m;
- Dam, reservoir landslide: 18 m.
5.3. Huong Hoa district:
- Dam of Tan Xuyen village irrigation reservoir, water reservoir in Luong Le village (Tan Hop) was landslide and backfilled;
- The irrigation works in Trang village, Huong Viet commune were completely washed away;
- Irrigation works in Kenh Vnh village, Huong Choa village (Huong Phung); Tan Tai village (Tan Lap); Cua village (Huong Tan) was eroded, washed away badly.
5.4. Trieu Phong district: A dyke to prevent salt from being eroded: 470m (Trieu Phuoc).
5.5. Cam Lo district: Many canals and channels were eroded and damaged (over 15km); Hoan Cat reservoir overflow, some small earth dams were eroded and washed away.
5.5. Quang Tri town: Over 100 m of irrigation pipeline of An Don Cooperative; landslide and damage to canals (Ru Cu-Gia Non, Soi Ha, N01, N02, N05) with a total length of over 13,320 m; Some canals and ditches are buried with soil and rock with a volume of about 3,800 m3.
Landslide of Thach Han riverbank in Tan My (Hai Le) and Nhu Le (An Don) with a length of over 1,240 m.
5.6. The works managed by Irrigation KTCT Management Company Limited:
- Damaged canal: 24,400m (excavated soil of all kinds: 18,610m3, concrete of all kinds: 410m3), of which:
+ 07 main channels: 14.400m.
+ 16 canal routes of level 1, level 2 and canals over grade: 10,000m.
In addition, the canal was eroded and damaged: over 10,000m (concentrated in districts Cam Lo, Huong Hoa, Dong Ha, Trieu Phong, Hai Lang, ...).
- About traffic:
6.1. National highways:
- National highway 15D: At locations Km7 + 600, Km10 + 976, Km11 + 170 and Km11 + 330, the road has been covered with sound slag in 1/3 of the road surface, barriers have been installed and warning signs are installed at this position;
- National Highway 9D: Falling, felling trees, clearing longitudinal ditches, bridges and culverts, ensuring smoothness;
- Highway 49C: From Km7 + 100 (Le Xuyen village) ÷ Km41 + 076 (end of route) are flooded many sections. Especially at Le Xuyen 1 - Km8 + 021 bridge: the roadbed at both ends of the bridge behind the abutment is eroded by water, traffic jam. Barriers were put in place, and vehicles were banned from passing through the bridge;
- National Highway 9: landslide in many sections, especially at the location of Km51 + 00 (Huong Hoa), Km50 + 150 (Dakrong) causes traffic congestion and has basically circulated the route up to now;
- Ho Chi Minh route West branch: at locations Km176, Km186, KM15 and Km19 (Huong Hoa); at Km252, Km 255, Km267, Km273, Km283 (Dakrong) to be eroded.
6.2. Provincial routes:
- DT.588a: Ba Long overflow bridge - Km11 + 240 is flooded with 30cm depth. Khe Cau Bridge- Km12 + 030 has eroded bridgehead road, currently fenced, only traffic for motor vehicles;
- DT.586: Km30 + 900 spillway is flooded with 30cm depth;
- DT.587: Route for motorbikes to Km16; car up to Km8;
- DT.582: From Km3 + 650 ÷ Km10 are flooded from 30-50cm;
- DT.584: Km9 + 800 ÷ Km17 + 261 are locally flooded 10-20cm deep;
- DT.578B: From Km6 + 300 going to the end of the route, which is flooded 20-30cm deep;
- Other routes are exploited normally.
6.3. District roads and rural roads:
- a) Huong Hoa district
Most of the routes appear at many positions with landslide, some serious routes such as:
- Cu Vo road, Huong Linh commune (DH.84): - Huong Tan - Huong Linh (DH.84B): Km 1 + 200 to Km3 + 500, of which 03 locations are eroded in large volume. traffic jam;
- Huong Phung - Huong Son Street (DH.83C):
- Routes in Tan Lap, Huong Tan, Huong Lap, Thuan, Le, Tan Lien, Tan Thanh, Tan Hop, A Doi communes, Khe Sanh town ...
- Tan Hop commune: The road in the center of the commune (Route T4) was eroded to about 25m long.
- b) Dakrong district
- Many roads were eroded in large volume such as: The road to the center of Ba Nang commune; the road for Ra Ro village, A Vao commune (200m3); the border patrol route belongs to Ra Poong, Ba Nang commune (100m3); The residential road of Cup village was eroded 3 points; the A Vao - Pa Linh route had been eroded 14 points; The A Vao - Tan Di route 2 was eroded 06 points; A Vao - Ra Leak road, landslide 03 points; Ro Ro village road was eroded 01 point; Tan Di village road 3 landslide 01 point; A Lieng village road was eroded 01 point; The inter-village road A Pul - Ta Rut 3 was broken 3 sections.
- The road to the center of A Vao commune (Cau Tram Ta Rut - A Vao), Ba Nang is divided into many locations such as Da Do, Ra Lay, Ta Rec bridges. Some inter-village roads A Bung, A Bung commune - A Rong village on A Ngo commune, internal road at Gia Gia village, Huong Hiep commune, inner Huc Nghi village, Huc Nghi commune, Ly Ton village, Ta Long commune are divided due to spills and underground flooded water level is 1-2m deep.
- The bridge abutment of the Xi Pa - Ta Pao inter-village road, Ta Long commune, is broken; A Đeng spillway in A Ngo commune was swept away by the flood, completely damaged; Tram Ang Treng, A Bung village, A Bung commune was damaged, a concrete road section and bridge abutment were swept away;
- Ky Neo bridge overflow has been eroded, there is a risk of bridge collapse;
- The bridge goes through the Ta Rut 1, 2, 3 drainage ditches cracked and broken, the bridge abutment 2 on the sides of the bridge is landslide, the bridge abutment subsidence and cracks, the bridge surface subsides, landslides;
- The Vuc Leng village overpass bridge was broken at both sides of the Vuc Leng bridge.
- c) Vinh Linh district
- Roads missed: 3,030 m (Cua Tung town, 30m east of National Highway 9D, Vinh Giang inner field road 700m, inner-village road of Tien My 700m, inner-village road of Vinh O 70m, residential road through industrial zone 1500m Vinh Chap, gravel road, Tan Truong village, Hien Thanh commune 300m);
- Tan Hoa bridge (Vinh Thai commune was damaged by two abutments), Vinh O bridge eroded abutment.
- Construction works are damaged: Roads in Len village (village 3), Vinh O commune; Vinh Ha cultural and sports area.
- d) Trieu Phong district
- Internal district roads eroded: (DT578b, QL49C, DH40, DH46 belong to Trieu Thuan; DH34, DH41 belongs to Trieu Thuong; DH41 belongs to Trieu Trach; DH40 belongs to Trieu Do, road DH37B Trieu Hoa);
- Rural roads: Trieu Ai: 100m, Ai Tu: 200m, Trieu Phuoc: 450m, Trieu Hoa: 4,500m, Trieu Thuong 512m, Trieu Van: 22m, Trieu Long: 600m).
- e) Gio Linh district: Roads were eroded and damaged: 2,930m, concrete road in Gio Linh district eroded 02 km.
- f) Cam Lo district:
- Cam Thanh - Cam Nghia inter-commune road.
- Many traffic roads were flooded (over 75km); landslide, damaged over 15km, such as Thuong Lam bridge abutment, main branch roads were eroded, badly damaged.
- g) Dong Ha city: The traffic route in Dong Ha's inner city was flooded 150m with landslide.
6.4. Inland waterways:
Ben Hai River, Thach Han River, Hieu River and O Giang River underwater signaling systems, on the banks were swept away and damaged by floods, including:
- Signal buoy D1,0m: 21 sets;
- Accessories for signal buoys D1,0m: 09 components;
- Onshore poles and signboards: 50 feet.
6.5. Projects in progress:
- Cam Hieu Bridge, Cam Lo district: Section from Km2 + 00-Km3 + 200: Erosion of roadside, road foundation on the right side of the route; peeling off the asphalt concrete road surface, all the drainage piles, Km piles and H pile on the route were washed away;
LRAMP Project: Tan Xuan - Tram Street; Hai Phu - Hai Quy; Nhi Thuong 1 - Hamlet 7; Thuan - Huong Loc; Tan Trang - Tan Dinh; Alcohol - Silver Stone; Determination - Hoa Thanh: Being eroded road surface, roadside.
6.6. Suspension bridges for people: Currently, 05 suspension bridges for people living in the province are exploited normally.
- About seafood
- Aquaculture area flooded and drifted: 1,305.46 ha (Gio Linh: 226.9 ha, Trieu Phong: 353.39 ha, Vinh Linh: 378.16 ha, Dong Ha: 33 ha, Huong Hoa: 32,125 ha, Cam Lo 42.8 ha, Quang Tri town 35.08 ha, Hai Lang 201 ha), 32 fish cages were swept away (Trieu Phong 30 cages/19 households, Hai Lang 02 cages);
- Some other damages such as: Frog, catfish were washed away (Vinh Linh); basket boats and nets were lost (Gio Linh, Trieu Phong); The motorboat was damaged, the waves broke Cua Tung town (Vinh Linh);
- 134 pumping stations of pumping stations were flooded and damaged (Vinh Linh 01 station, Hai Lang 79 stations; Trieu Phong 54);
- Food is flooded, damaged: 121.6 tons (Vinh Linh 01 tons of shrimp feed, Hai Lang 12 tons of fodder, Trieu Phong 05 tons of bran, 20.2 tons of corn, 83.4 tons of animal feed);
- About clean water works
- Huong Hoa district: domestic water works were washed away over 3,500m of pipeline (Huong Viet); The drinking water systems in the Chieng Vnh and Cheng villages were buried by soil and rock, severely damaged.
- Dakrong district: The village's domestic water works were washed away over 672m of pipeline (A Vao commune); Water works for living in Huc Nghi commune resettlement area.
- About contact information
9.1. Postal:
Many routes were suspended. Up to now, has returned to normal.
9.2. Telecommunication:
Some broadcasting stations, BTS were stopped working. Up to now, has overcome.
- On industry
- Broken 07 electric pillars (Huong Hoa 01 pillar, Dong Ha 01 pillar, Trieu Phong 05 pillars);
- 01 transformer station exploded (Trieu Phong).
- Other damage:
Many other damages happened in the whole province, concentrated as: flooded vehicles, motorcycles, damage, swept away; damaged rice mill, agricultural equipment; Some offices had walls, fences, roofs blown away; flooded cement damaged; flooded organic agricultural areas; flooded computer equipment, household electronic appliances ...
In addition, irrigation works, dykes, river erosion, coast, traffic, construction, schools, health care, ... are inundated and cannot be checked, damage statistics.
VI. Rescue work, and rescue ships at sea:
At 6:21am on October 18, the Standing Office for NDPC and Rescue of the province received the following information from the Quang Tri Maritime Port: At 5:00 a.m., ship HB Hai Thinh 08/05 crew members drifted from above Cua Viet road bridge to Cua Viet port area, specifically:
- Location: drifted into Cua Viet navigational channel;
- Nature of the accident and request for assistance: Vehicle is unable to maneuver.
- Currently, the Standing Office of the Command for Fire Prevention and Rescue of the province has communicated to the Provincial Border Guard Command and relevant units and localities to coordinate in rescuing ships in distress.
VII. Landslide recovery and rescue work
- Landslide in Huc commune, Huong Hoa district at 5:30pm on October 17, 2020 in Ta Rang village, Huc commune, Huong Hoa district, there was a landslide, killing 02 and missing 04.
- At 1:05am on October 18, in the area of Cam village, Huong Phung commune, Huong Hoa district, a landslide occurred in the cafeteria and motel of workers of the National Defense Economic Union 337.
In order to promptly grasp information and provide urgent direction for particularly serious landslides occurring in Huong Hoa district, at dawn on October 18, 2020, the Provincial People's Committee convened an emergency meeting. Currently, the Provincial People's Committee has established delegations and assigned provincial leaders to act as heads of delegations to promptly approach the scene to direct the rescue, overcoming and taking advantage of drastic implementation right from the first hours after the incident. out.