Project context
From July 7 to August 9, 2006, heavy rains continuously attacked the Pingtung district, Taiwan. The accumulated rainfall of 1,380mm has completely absorbed into the ground, causing a slope of the roof on route No. 35 to collapse.
ACE solution
Considering the cost, effectiveness, sustainability and field conditions, the design department proposed a complex protection system for restoration. Use ACEGrid® as reinforcement material to build MSE 18m high mechanical stabilized earth wall as a road foundation structure. In addition, a geotechnical and grid connection system is designed to eliminate the problem of falling due to insufficient length of landfill in the geotextile.
Contribution
With ACE's complex and advanced protection solution, a safe, economical and environmentally friendly system has been built. Since the completion of the project in 2007, this site has maintained good stability after experiencing a number of strong storms, including the deadly Morakot storm in 2009.
Here is more information about the geotechnical products, applications and works already done, please click the link below to learn more:
Related products: ACEGrid® - GG
Related applications: Stable slope stabilization
Related works:
What we provide
For details about the project's analysis and design, contact
sales.vn@geoace.com